Fountain design is a waterscape designed by artificial shaping or natural fountains to spray beautiful water postures for people to watch. Fountains are an important part of gardens. In modern gardens, besides plant landscape, fountain is also an important landscape. It is not only a kind of waterscape art, reflecting the combination of dynamic and static, forming a clear and lively atmosphere, giving people enjoyment of beauty. At the same time, fountains can also increase the content of negative ions in the air, purify the air, increase the air humidity, reduce the ambient temperature and so on, so they are deeply loved by people.
First, the construction preparation
In case of difficult investigation, the construction period, construction site layout, investigation, etc. shall be arranged in sections to understand the current situation of site elevation and retest to confirm the coordinates and elevation of points. With sufficient construction machinery, sufficient labor force and good supply, the foundation has been laid for the implementation of the overall progress of the plan.
Technical force preparation
The establishment of a technical team headed by the person in charge of our company's information technology enterprises is based on the system to ensure the correctness of the implementation of the network system. Arrange technical researchers with rich construction experience to enter the site.
Carefully read the construction drawings, fully understand and carefully weigh them so that the construction can fully reflect the design intent. ..
1, construction machinery and equipment
Implement the necessary mechanical and technical equipment for the project.
The implementation of a rich student mechanical equipment repair and maintenance of the machine operators.
Establish a mechanical inspection system to ensure timely inspection after daily operation is completed and timely repair of problems found to ensure normal construction of the project ..
2. Preparation of Materials and Materials
According to the overall schedule, prepare materials, material approach plan ..
You can have a good idea of the materials needed for site management. The allocation is well done and well prepared.
Adjust the preparation plan at any time to ensure the smooth progress of site construction. ..
Through professional, according to the process, someone is responsible.
3. Labor preparation
Arrange sufficient construction teams to carry out the project, and provide reserve forces to organize labor to enter the site according to China's labor cost plan.
Select personnel with good quality, safety awareness, high technical level and similar construction experience.
Second, the construction guiding ideology
The construction of this project is guided by "one social civilization, two emphases and three guarantees".
1, a civilization:
Scientific and technical reasonable arrangement of construction site, construction sequence and scientific management of construction methods, do a good job in civilized construction site construction.
2. Two Key Points:
Pay attention to civilized construction, protect the environment and prevent environmental pollution.
We should pay attention to quality and safety, and put quality first in order to eliminate hidden dangers.
3, 3 ensure:
To ensure the construction quality of information engineering: establish a sound quality assurance management system, operate strictly in accordance with IS09001 quality assurance economic system, organize standardized and standardized operations, carry out all-round activities to create excellent teaching quality, effectively control and evaluate the quality problems of engineering projects according to the provisions and requirements of relevant technical standards, and ensure the engineering quality grade is qualified.
Ensure the construction period. During the construction phase, a construction climax is rapidly formed. During the construction process, network planning is adopted to organize the construction, key lines are grasped to control the construction period, parallel organization and flow operation are carried out, and multiple blocks are reasonably divided to ensure the realization of the construction period target.
In order to ensure the safety of construction: establish a perfect safety guarantee system, establish rules for safe production, determine reward and punishment system, carefully organize the guarantee, and establish the concept of "construction safety is everyone's responsibility" to ensure the safety goal.